/Co-op, Substation Design Services

Co-op, Substation Design Services

Tucker, GA, USusvia direct
// Job Type
Full Time
// Salary
Not disclosed
// Posted
8 months ago
// Seniority
intern
// Work Mode
onsite

About the Role

Fall 2026 & Spring 2027 Students must be a part of the school's Co-op/Intern Program with a 2.7 GPA and able to work full time hours (this position is not remote). Please submit Unofficial Transcript along with Resume when applying. Assists staff of Design Services department in research and physical design requirements of transmission lines and electrical power substations. Drafts modification changes for substation physical drawings to include, foundation designs; steel and concrete structures design; estimating project costs, and electrical ground grid analysis. Occasional field trips to pre-designed substations and pre-construction designed projects. Assembles design drawing packages for approval; issues construction prints once approved, and assembles purchase orders and drawing lists. Working knowledge of AutoCAD, Excel spreadsheets (with macros), Word, and PowerPoint. Good verbal and written communication skills. Desired Major(s): Civil or Mechanical Engineers

Tech Stack

AutoCADExcelWordPowerPoint

Interested in this job?

Login to Apply

Use our AI to tailor your resume for this Co-op, Substation Design Services position at Georgia Transmission Corporation.