About the Role
Construction of Turkey’s Yavuz Sultan Selim bridge not only created a third crossing linking Europe and Asia across the mighty Bosphorus Straits, it also marked a major step forward in stay cable technology. The new bridge carries the North Marmara Motorway over the strategic waterway, enabling traffic to bypass the city of Istanbul, boosting highway capacity and relieving congestion on the existing crossings.
NAME OF THE OWNER
KGM (General Directorate of Highways)
NAME OF THE CLIENT
HDSK (Hyundai Engineering & Construction/SK Engineering & Construction JV)
DELIVERY DATE OF THE PROJECT
July 2016
PARTNERS OF THE PROJECT
Concessionnaire: ICA (Ictas/Astaldi JV)
General contractor: HDSK
Engineer: T-Engineering & Bureau Greisch
SULTAN YAVUZ SELIM BRIDGE
A hybrid arrangement
A traditional suspension bridge form with a shallow deck was chosen for its aesthetics, and to complement the existing Bosphorus bridges. But the need to stiffen the bridge by the addition of a series of super-long, high-strength cables resulted in the creation of a rare, hybrid stay cable technology arrangement.
One of the biggest challenges of the project was to design and build a bridge of this size and complexity in just 36 months. With its main span of 1,408 m, 59 m-wide deck and towers rising more than 320 m above the water, its scale and form were unprecedented.
Added to this was the need to develop and test new equipment capable of erecting, anchoring and restraining the movement of the longest and heaviest parallel strand cables Freyssinet had ever manufactured.
36
Months
1,408
Length of main span (m)
322
Height of towers
59
Width of bridge deck
A heavy load
The highway and rail loads that were predicted meant ultra high-strength strand was needed, leading to the first use of Freyssinet’s 1,960 MPa cable strand – and setting another global record.
A total of 176 stay cables was installed, the longest of which measure more than half a kilometre and contain an incredible 151 strands, weighing in at almost 120 t. The capacity needed to test these cables exceeded that of the world’s biggest testing rigs; even the smallest stays on this project are large when set against those of standard cable-stayed bridges. To manufacture the 9,000 t of high-strength strand needed to produce these cables in such a short time demanded faultless quality control across our supply chain.
Flexible working
This short project time-frame led to additional challenges, with detailed design of certain elements having to be adapted to suit those that had already gone into production. What’s more, the unconventional combination of cable systems led to heavily-loaded stays that were prone to sagging and at higher risk of excitation.
Specially-designed deviators were developed to control the alignment of the cables at the anchorages. These elements had to be tested to provide assurance not only that they would be effective, but that restraint of the cables would not damage the sheathing intended to protect them. Finding the optimum solution for durability was just as important as influencing the structural behaviour.
Stay cable technology control
The potential scale of excitation under wind loads demanded damping of the free length of the cables while allowing them to move freely under service loads. Factors such as the size of the predicted movement, the scale of the cable stays and the restricted space available led to the design of 7.4 m-high masts supporting hydraulic pistons with a stroke of ±920 mm.
On site, Freyssinet’s standard procedure for erecting and stressing the strand had to be adjusted to take account of the presence of the main cable directly overhead and the need to work in parallel with many other contractors to meet the programme completion date.
Yavuz Sultan Selim bridge BB3_2016.03 @Freysas
Yavuz Sultan Selim bridge - 2015.03 @Aykut ECEVIT
Yavuz Sultan Selim bridge BB3 - View from the top
Yavuz Sultan Selim bridge BB3_2015 05 Deck construction @Francis Vigouroux
Yavuz Sultan Selim bridge BB3_05_2015_Under-construction@Francis Vigouroux
Yavuz Sultan Selim bridge BB3_2016.01 Prestressing @francis Vigouroux
Yavuz Sultan Selim bridge BB3_2016.03-Team@Freysas
Yavuz Sultan Selim BB3_2016.09_Lightning-Copyright Freyssinet Freysas
‹
›
You have a project?
Our local experts will help you achieve your project thanks to our large range of solutions.
FIND YOUR LOCAL CONTACT
R&D and Innovation
Our innovation strategy reflects our ambition: to provide solutions that meet our customers’ needs, and which are also more sustainable and environmentally friendly.
DISCOVER OUR R&D VISION
Discover other references
BUILD
VIETNAM
Bai Chay cable-stayed bridge
Concern over the magnitude of wind loading and potential for vibration that was predicted on the Bai Chay cable-stayed bridge in Vietnam led to the introduction of new, compact stay cables.
BUILD
TURKEY
Çayırköy viaduct incremental launching
While incremental launching was the most appropriate method to construct the viaduct, it required complete rethinking to adapt to the project’s unusual configuration.
BUILD
VIETNAM
Cua Dai extradosed bridge using Cohestrand technology
Locally-cohesive Cohestrand technology was successfully produced and installed for the first time on an extradosed highway bridge which crosses the Tra Khuc River to create a coastal bypass of Quang Ngai city.
BUILD
SOUTH KOREA
Geoga cable-stayed bridge
Located in an exposed offshore area subject to high-speed winds and to potential typhoons, the cable-stayed bridge had to be equipped with the most robust cable anti-vibration system and durable stay cables.
BUILD
RUSSIA
Russky Island cable-stayed bridge
Russky Island cable-stayed bridge pushed the limit for cable-stayed structures, its main span setting a new world record and demanding extra-long cables designed for the region’s harsh climate.
Learn more about our solutions
BUILD
Bridges
BUILD
Cable systems
BUILD
Post-tensioning systems
BUILD
Seismic protection
Contact us
You have a question about our solutions or you already have a project in mind? Please fill out the form below and our teams will get back to you shortly.
Your profile**
Your profile*
I'm a company
I'm a candidate
I'm a journalist
Other
Country**
Country*
Afghanistan
Albania
Algeria
American Samoa
Andorra
Angola
Anguilla
Antarctica
Antigua and Barbuda
Argentina
Armenia
Aruba
Australia
Austria
Azerbaijan
Bahamas
Bahrain
Bangladesh
Barbados
Belarus
Belgium
Belize
Benin
Bermuda
Bhutan
Bolivia
Bonaire, Sint Eustatius and Saba
Bosnia and Herzegovina
Botswana
Bouvet Island
Brazil
British Indian Ocean Territory
Brunei Darussalam
Bulgaria
Burkina Faso
Burundi
Cabo Verde
Cambodia
Cameroon
Canada
Cayman Islands
Central African Republic
Chad
Chile
China
Christmas Island
Cocos Islands
Colombia
Comoros
Congo
Congo, Democratic Republic of the
Cook Islands
Costa Rica
Croatia
Cuba
Curaçao
Cyprus
Czechia
Côte d'Ivoire
Denmark
Djibouti
Dominica
Dominican Republic
Ecuador
Egypt
El Salvador
Equatorial Guinea
Eritrea
Estonia
Eswatini
Ethiopia
Falkland Islands
Faroe Islands
Fiji
Finland
France
French Guiana
French Polynesia
French Southern Territories
Gabon
Gambia
Georgia
Germany
Ghana
Gibraltar
Greece
Greenland
Grenada
Guadeloupe
Guam
Guatemala
Guernsey
Guinea
Guinea-Bissau
Guyana
Haiti
Heard Island and McDonald Islands
Holy See
Honduras
Hong Kong
Hungary
Iceland
India
Indonesia
Iran
Iraq
Ireland
Isle of Man
Israel
Italy
Jamaica
Japan
Jersey
Jordan
Kazakhstan
Kenya
Kiribati
Korea, Democratic People's Republic of
Korea, Republic of
Kuwait
Kyrgyzstan
Lao People's Democratic Republic
Latvia
Lebanon
Lesotho
Liberia
Libya
Liechtenstein
Lithuania
Luxembourg
Macao
Madagascar
Malawi
Malaysia
Maldives
Mali
Malta
Marshall Islands
Martinique
Mauritania
Mauritius
Mayotte
Mexico
Micronesia
Moldova
Monaco
Mongolia
Montenegro
Montserrat
Morocco
Mozambique
Myanmar
Namibia
Nauru
Nepal
Netherlands
New Caledonia
New Zealand
Nicaragua
Niger
Nigeria
Niue
Norfolk Island
North Macedonia
Northern Mariana Islands
Norway
Oman
Pakistan
Palau
Palestine, State of
Panama
Papua New Guinea
Paraguay
Peru
Philippines
Pitcairn
Poland
Portugal
Puerto Rico
Qatar
Romania
Russian Federation
Rwanda
Réunion
Saint Barthélemy
Saint Helena, Ascension and Tristan da Cunha
Saint Kitts and Nevis
Saint Lucia
Saint Martin
Saint Pierre and Miquelon
Saint Vincent and the Grenadines
Samoa
San Marino
Sao Tome and Principe
Saudi Arabia
Senegal
Serbia
Seychelles
Sierra Leone
Singapore
Sint Maarten
Slovakia
Slovenia
Solomon Islands
Somalia
South Africa
South Georgia and the South Sandwich Islands
South Sudan
Spain
Sri Lanka
Sudan
Suriname
Svalbard and Jan Mayen
Sweden
Switzerland
Syria Arab Republic
Taiwan
Tajikistan
Tanzania, the United Republic of
Thailand
Timor-Leste
Togo
Tokelau
Tonga
Trinidad and Tobago
Tunisia
Turkmenistan
Turks and Caicos Islands
Tuvalu
Türkiye
US Minor Outlying Islands
Uganda
Ukraine
United Arab Emirates
United Kingdom
United States
Uruguay
Uzbekistan
Vanuatu
Venezuela
Viet Nam
Virgin Islands, British
Virgin Islands, U.S.
Wallis and Futuna
Western Sahara
Yemen
Zambia
Zimbabwe
Åland Islands
First name*
Last name*
Email*
Phone number
Message*
*Mandatory fields
Consent*
I agree to be contacted back by email provided following our terms of use*
ATTACH A FILE
SEND YOUR MESSAGE
Tech Stack
stay cable technologystructural engineeringconstruction managementproject managementcable erectioncable anchoringcable restraininghigh-strength strand manufacturingquality controldeviator designhydraulic piston systemswind load analysisvibration damping