Energise Your Career, Accelerate a Net-Zero Future #RenewablesJobs
Join us as a Wind Turbine Technician at our wind farm in Dorenell!
Are you ready to power the future? Join a dynamic team at the forefront of renewable energy and take your career to new heights.
We are EDF Renewables - a dedicated and forward-thinking owner-operator with an extensive pipeline of new wind projects, committed to your safety, well-being, and a great employee experience.
Reward:
£37,700 - £54,200 according to experience (We have a graded reward package to suit new entrants to the renewables industry through to the most experienced Wind Turbine Technicians).
Working hours - New Technician (37hrs) plus overtime is available.
The awesome extras!
25 days annual leave + Bank Holidays
Industry Leading Pension & Life Insurance
5% Bonus
On-call allowance
Overtime x 1.5
Overnight allowance
Senior Authorised Person allowance
Shared works vehicle for travel to and from site
What you’ll do:
What’s in it for You?
Who are you?
What skills do you need?
You’ll be a skilled engineer with great electrical maintenance experience, having worked on three phase systems or heavy plant electrical.
Previous experience on wind farms is beneficial, but not essential. We can train you to multi-skill.
Location: Dorenell Visitor Centre, Nether Ardwell, Lower Cabrach, Huntly, AB54 4EL
For this role, you will generally be located within 45 minutes of the site and have a full UK drivers licence.
Ready to make a difference? Apply now and become a wind warrior!
Join us, and let’s do good together.
Use our AI to tailor your resume for this Wind Turbine Technician - NE Scotland position at EDF Energy.